Industrial epoxy
A system to consider for warehouse aisles, work areas and maintenance shops. Traffic, chemicals and cleaning methods help determine the build and topcoat.
A forklift aisle, a washdown area and a service bay put different demands on the floor. Concrete Indy helps facility teams and general contractors in Central Indiana plan the slab prep, coating and shutdown window for each area.
We start with what rolls, spills or gets washed across the floor. Then we review the condition of the slab, the required texture and the time available for installation and cure.
A system to consider for warehouse aisles, work areas and maintenance shops. Traffic, chemicals and cleaning methods help determine the build and topcoat.
Options to evaluate when the specification calls for a particular topcoat, finish or return-to-service window. Timing and performance depend on the selected system and site conditions.
We can review aggregate texture for wet areas and specialty requirements such as washdown, thermal cycling or static control. Send the project specification so we can confirm what can be included.
For an existing floor, we look at worn coatings, oil or other contamination, surface damage, joints and moisture. Mechanical preparation and any testing depend on the specified system. Deteriorated areas may need repair or replacement before they can be coated.
For a new slab, coordinate the pour, cure, prep and coating as one schedule. For an occupied facility, tell us which areas can close and when pedestrians, carts or forklifts must return.
Explore Commercial Concrete · Large Slabs & Commercial Floors
Sometimes. We need to inspect the old coating and slab, including areas that peel or stay damp. The specified system may require removal, a test area or repairs rather than going directly over the old finish.
Foot traffic and forklift traffic can have different return times. The selected product, slab and air temperatures, humidity, and installation schedule all matter. Confirm the return-to-service schedule before work starts.
Square footage is only one piece. Removing old coatings, slab repairs, moisture testing, texture and striping requirements, restricted access, and phased or after-hours work can all change the estimate.
Send the address, approximate square footage, floor photos and the target reopening date. If you have a finish schedule, coating specification or known chemical exposure, include that too.
Swipe to see both photos